OFFICE OF THE BUILDING OFFICIAL (OBO) SERVICES

Checklist of Requirements
A. New Application:
1. Residential-Based Business

  • Affidavit of Non-Rental
  • Proof of Non-Renovation (photo)

2. Commercial (Lessor)

  • Approved Occupancy Permit

3. Commercial (Lessee)

  • Notarized Contract of Lease
  • Annual Inspection Certificate/Updated Mayor’s Permit of Lessor
  • Proof of Non-Renovation

B. Renewal

1. Previous Billing with Receipt or Certificate of Annual Inspection
2. Not Applicable for Billing

  • Residential-Based Business
  • Sari-Sari Store
  • Stall
  • Kiosk
  • Temporary/Movable Structures
  • Church
  • Government-Owned Structures and Businesses

Checklist of Requirements
1. Zoning
2. Fire Department Clearance
3. Building Permit Application Form (5 copies)
4. Electrical Permit Application Form (3 copies)
5. Plumbing Permit Application Form (3 copies)
6. Mechanical Permit Application Form
7. Five (5) Set of Plan
8. Bill of Materials
9. Specifications
10. CTC Land Title
11. Tax Declaration
12. Tax Receipt
13. Lot Plan
14. Deed of Sale/Contract of Lease
15. Structural Analysis
16. Electrical Design Analysis
17. DPWH Clearance (if a property is along the hi-way)
18. ATO Clearance (for Tower and Hi-rise construction)
19. DENR Clearance (for Commercial Bldg, but depends on the usage or more than 1k sq.m floor area)
20. DOLE Clearance
21. Subdivision Pre-Approval (depends on the subdivision)

NOTE: Requirements must be complete upon submission.

To apply for a building permit online, please scan the QR Code below:

Checklist of Requirements
1. Private-Owned Lot (Temporary Structure Only)

  • Copy of Land Title
  • Electrical Permit Application Forms

2. Government-Owned Lot

  • Barangay Certification
  • Electrical Permit Application Forms

3. Relocation Site

  • Bacolod Housing Authority Certification
  • Electrical Permit Application Forms

4. Reconnection

  • Clearance from CENECO
  • Electrical Permit Application Forms

5. Separate Meter

  • Previous CENECO Billing
  • Electrical Permit Application Forms

If you need any further clarification and information, please contact Tel. No. (034) 433-8286.

CHECKLIST OF REQUIREMENTS

• Building Permit application form (5 sets)
• Electrical Permit application form (5sets)
• Sanitary/Plumbing Permit application form (5 sets)
• Mechanical Permit application form (5 sets)
• Electronics Permit application form (5 sets if needed)
• Sets of Plans (5 sets)
• Bill of Materials and Cost Estimates (5 sets)
• Specifications (5 sets)
• Land Title or TCT (Certified by Register of Deeds)
• Latest Tax Receipt
• Tax Declaration
• Lot plan certified by Geodetic Engineer
• Deed of Sale/Contract of Lease if application name is not registered TCT name
• Structural analysis for 1 storey building in excess of 20sq.m. and all building 2 storey and above with seismic analysis
• Certification of structural engineer in case of additional floor (structural stability)
• Plate load test analysis – for 3 storeys and above -2 copies
• Soil Boring Test Result- for 3 storeys and above – 2 copies
• Clearance from the government agencies exercising regulatory function- 2 copies, such regulatory agencies are:
o City Planning and Development Office for Zoning Clearance
o

o Bureau of Fire Protection- for Fire Department Clearance
o Environmental Management Bureau Certificate (EMB), ECC or CNC for commercial, institution, industrial buildings and cellsites
o Air Transportation Office – for buildings/structures exceeding 45 meters in heights and near airports.
o Philippine Tourism Authority- for tourist oriented projects
o DRRMO and Barangay Resolution for project near or above waterways, creeks and rivers.
o Department of Labor and Employment- for construction safety and health program.

To facilitate processing, please take note of the following before submitting the application to the OBO

  • Requirements of the National Building Code
  • Requirements of the Referral Code/Architectural Code, Philippine Electrical Code (PEC),Revised Plumbing Code, National Structural Code (NSCP) Philippine Mechanical Engineering Code (PMEC), Philippine Electronics and Communication Code (PECC)
  • Laws and City Ordinances effecting the design/project
    • ECC Ordinance (city ordinance no. 308 series of 2002)
    • Cellular Tower Ordinance (city ordinance no. 364 series of 2004)
    • City Ordinance No. 335 Series of 2003 as amended
  • Compliance with BP 344 should be indicated in detail on plans for commercial, institutional and public buildings.
  • Provision of Parking area for new buildings (institutional and commercial).
  • If set backs and side yard requirement are not met, firewall (strictly with no opening) must be provided which shall not extend beyond 1 meter from roof level.
  • A special power of attorney shall be provided if owner is not the signatory in all applications.
  • Forms and letter, plans specification, bill of materials and cost estimates and other pertinent documents must be signed and sealed by the designer complete with latest PTR and PRC ID.

Note: All these documents must be signed by the owner.

CLIENT STEPS

1. Secure Building Permit Application form with the list of requirements, including routing
*Secure clearances from other agencies.
2. Secure Fire endorsement to acquire Fire Safety Evaluation Clearance from the Bureau of Fire Protection.
3. Submit a duly accomplished application form including building requirements with complete clearances for verification and proper evaluation. Plans and specifications are to be assessed if they conform to the technical requirements of the National building code and other applicable laws and ordinances.
4. Client proceeds to City Treasurer’s Office, present the order of payment, pay prescribed fees/s and receive official receipt (O.R.) and return to OBO
4.1. Client claims released permit

TABLE I.

NEW SCHEDULE OF FEES AND OTHER CHARGE

  1. Bases of assessment
    1. Character of occupancy or use of building/ structure
    1. Cost of construction
    1. Floor area
  2. Regardless of the type of construction, the cost of construction of any building/ structure for the purpose of assessing the corresponding fees shall be based on the following table:

Table II.G.1. On fixed Cost of Construction Per Sq. Meter

LOCATIONGROUP
All cities/ MunicipalitiesA, B, C, D, E, G, H, & IFJ
P10,000P8,000P6,000
  • Construction/addition/ renovation/ alteration of building/ structures under Group/s and Sub-division shall be assessed as follows:

Building/ Structures Fees

aDivision A-1 Area in sq. meterFee, (P) Per sq. m.
i)Original complete construction up to 20.00 sq. meter –2.00
ii)Additional/ renovation/ alteration up to 20.00 sq. meters regardless of floor area of original construction2.40
iii)Above 20.00 sq. meters to 50.00 sq. meters –3.40
iv)Above 50.00 sq. meters to 100.00 sq. meters –4.80
v)Above 100.00 sq. meters to 150.00 sq. meters –6.00
 vi)Above 150.00 sq. meters-7.20
cPole/ Attachment Location Plan PermitFee, (P)
 i)Power Supply Pole Location30.00/ pole
 ii)Guying Attachment30.00/ attachment

For Air conditioning (refer to 5.a.iii.)
0.90 kw per ton, for compressors 1.2 to 5 tons capacity
0.80 kw per tons, for above 5 up to 50 tons capacity,
0.70 kw per ton, for compressor above 50 tons capacity.

NEW APPLICATION
For tenants

  1. Contract of lease duly notarized
  2. Annual Inspection Billing with O.R / Certificate of Annual Inspection of building owner
  3. Affidavit of Non-Rental conformed by building owner and duly notarized if occupant does not
    pay rent

    For newly constructed bulding / structure
  4. Certificate of Occupancy
    For altered structures for commercial purposes
  5. Applicant should bring PHOTOS of the renovated structure for evaluation (may be subject for
    refferal to bulding inspector for verification)
  6. Applicable permit (i.e. water refilling station should submit ELECTRICAL,MECHANICAL and
    PLUMBING PERMIT) depending on the nature of business and installation.

    EXEMPTION
    • Businesses in residences
    • Stalls
    • Kiosks
    • Movable and temporary structures
    • Sari-sari Store
    • Food Carts
    • In compliance to DILG Memorandum Circular 2020-145
    • Common Carrier and Tricycle
    • Public Buildings and Traditional Indigenous dwellings (Section 209 of P.D. 1096 and ITS I.R.R)
    Businesses offering MEDICAL AND LEGAL SERVICES ONLY (Section 139 of THE LOCAL GOV’T
    CODE)


    RENEWAL
  7. Annual Inspection Billing with O.R. / Certificate of Annual Inspection
  8. Business Permit Application
  9. For application with amendments (i.e new owner, new address or error on business
    information) BRING SUPPORTING DOCUMENTS